Illumination WALD STUDIO

5Feb/180

Vision 3

Vision 3 Lighting stopped by to give us an update on their products. They boast a 2-3 week lead time for all fixtures as a standard and can possibly do 1 week depending on the fixture and quantity.

Their line voltage fixture has a 1200 Lumen package with the driver on board and 0-10v dimming.

They have tested their low-voltage fixtures with Soraa for dimming compatibility with their transformers. There are various standard finishes available as standard including polished stainless steel.

Comments (0) Trackbacks (0)

No comments yet.


Leave a comment

No trackbacks yet.

Follow on Feedly